Dutch transmission system operator (TSO) TenneT has completed its 700 MW offshore grid connection programme with the grid readiness certification now in place for the Hollandse Kust West Beta connection, the company said on 28 October.
Cable installation for Hollandse Kust West Beta grid connection; Photo source: TenneT
The certification marks the completion of the last three 700 MW Hollandse Kust offshore grid connections in the Dutch sector of the North Sea. Each installation links a designated offshore wind farm zone to the mainland electricity network, enabling the transfer of renewable power once the wind farms become operational.
TenneT said Hollandse Kust West Beta received its official grid readiness declaration after final testing and certification procedures were completed. The certificate confirms that the offshore grid connection is technically ready to transmit electricity and can be connected and commissioned once its designated offshore wind farm is at that stage.